REALIZATIONS

2019


Celon Pharma S.A

  • Execution of electrical installation in newly built research and development centre of the company.

Reckitt Benckiser

  • Modernisation of I&C systems installation of HH5 and HH6 production line on factory grounds.
  • Execution of electrical installation and I&C systems alongside the project SUPERMAN STAGE II and III on Reckitt Benckiser factory grounds.

Malbork Sugar Factory

  • Modernisation of electrical installation and I&C systems for heat economy.

Barry Callebaut

  • Barry Callebaut Łódź – moulding line 3.

Xella Ostrołęka

  • Replacement of crushing plant drivers and optical fibre montage in production hall of Ytong plant in Ostrołęka.

The Supreme Chamber of Control

  • Execution of periodical measurements of electrical installation, computer power supply and actualisation of documentation and descriptions of sockets and switchgears in headquarter buildings of the Supreme Chamber of Control in Warsaw.

GE Międzyrzec Podlaski

  • Execution of essential works allowing creation of environment for optimal work of GE Gamma apparatus in research studio of Międzyrzecz hospital.

Ptak – Mandoria Park

  • Reconstruction of a part of trade hall with exploitation change for entertainment park.

Kellogg’s Kutno

  • Arbo.

Fortech

  • Execution of electric connection for PHILLIPS-FORTECH production facility alongside transformer station and dismantlement of previously functioning pole station.

PGE

  • PGE Sieradz Zone – Construction of mid-voltage junction, mid-voltage cable line, accoutrement of 15 kV field in 110/15 kV “Jawor” station for affiliation of investment grounds (waterworks economic zone).
  • PGE Zgierz Zone – Reconstruction of overhead 15 kV line RUDUNKI-DUBOIS.
  • PGE Łódź Zone Przewodnia-Wojewódzka street – Reconstruction of mid-voltage cable line in route: Łódź, station no. 20618 Wojewódzka 14 – station no. 20360 Przewodnia 11a.
  • PGE Łódź Zone Michała-Gościnna street – Reconstruction of mid-voltage cable line in route: Łódź, station no. 20669 Michała 7a – station no. 21430 Gościnna 10.
  • PGE Łódź Zone Krokusowa-Edwarda street – Reconstruction of mid-voltage cable line in route: Łódź, station no. 10252 Krokusowa 1 – station no. 20802 Edwarda 41a.
  • PGE Zgierz/Aleksandrów Łódzki Zone – Reconstruction of pole station no. 40640 to interior 20/630 kVA and overhead line to cable line.
  • PGE Zgierz Emilia Zone, Zgierz parish – Reconstruction of  15 kV overhead line in Rosanów to cable line and pole station no. 40172 to interior station.
  • PGE Łódź, Żeromskiego Street.
  • PGE Czerniewice.
  • PGE Łódź, Narutowicza Street.
  • PGE Skierniewice.
  • PGE Tymianka.
  • PGE Łódź, Pomorska Street.
  • PGE Łódź, Sienkiewicza Street.
  • PGE Łódź, Kopcińskiego Street.
  • Zduńska Wola.
  • Łódź Bema – Brukowa – Fizylierów Street.
  • Solar plant connection in Józefiatów.
  • Rzgów, Katowicka Street.
  • Świątniki.
  • Drzazgowa Wola.
  • Solar plant connection in Szczawin.
  • Solar plant connection in Fałków.
  • Solar plant connection in Trząs.
  • Solar plant connection in Gajewniki.
  • Solar plant connection in Rzeczyca.
  • Solar plant connection in Inowłódz.
  • Solar plant connection in Jasień.
  • Solar plant connection in Ujazd.
  • Solar plant connection in Bachorzyn.
  • Solar plant connection in Karolew.
  • Tomaszów Mazowiecki, Strzelecka Street.
  • Solar plant connection in Erminów.
  • Solar plant connection in Adamowa Góra.
  • Solar plant connection in Truszczanek.
  • Solar plant connection in Krępa.
  • Solar plant connection in Izabelów.
  • Solar plant connection in Karsznice.
  • Solar plant connection in Kaszewice.
  • Solar plant connection in Komorów.
  • Łódź, Wojewódzka Street.
  • Tomaszów Bukowiec.
  • Łódź, Żurawia Street.
  • Solar plant connection in Sadykierz.
  • Solar plant connection in Gazomia Star.
  • Wiskitki.
  • Łódź, Edwarda Street.

PGE

  • Construction of pole stand with radio-controlled disconnector switch for means of affiliation of solar plant in Siemkowice.

PGE

  • Modernisation of pole stand “Mid-voltage measurement gateway” in Wilczków.

PGE

  • Reconstruction of pole stand with radio-controlled disconnector switch for means of affiliation of solar plant in Jeziorzec.

PGE

  • Reconstruction of pole stand with radio-controlled disconnector switch for means of affiliation of solar plant in Malenia.

PGE

  • Reconstruction of pole stand with radio-controlled disconnector switch for means of affiliation of solar plant in Piaski Bankowe.

PGE

  • Reconstruction of pole stand with radio-controlled disconnector switch for means of affiliation of solar plant in Czerwonka.

PGE

  • Zielona 6- Construction site power supply.

PGE

  • Reconstruction of tram lines into Śmigłego-Rydza alleyway in Łódź – Reconstruction of viaducts on Śmigłego-Rydza alleyway on section from Piłsudskiego alleyway to Przybyszewskiego street. Liquidation of mid-voltage and low-voltage collision.

2018


Military Medical Academy

  • CT Scanner.

Crisis Management Center and Municipal Guard in Łódź

  • Reconstruction, expansion and over construction of a building complex located in Łódź by Wólczańska 121/123 for the use of Municipal Guard and Crisis Management Center.

Barry Callebaut Łódź

  • Assemblage of busbar powering production line no. 8 on factory grounds.

Supreme Chamber of Control Warsaw

  • Exterior lighting.

LaLorraine Bakery

  • Extension of LaLorraine Bakery Stage II – I&C ventilation systems installation.

Reckitt Benckiser

  • Electro-instalatory works with installations POTATO and REDPILe on factory grounds.
  • Execution of electrical installation and assembly of display units in TABS1 sector on factory grounds.
  • Execution of electrical installation and I&C systems alongside the project SUPERMAN STAGE I on Reckitt Benckiser factory grounds.

Gdańsk Northern Port

  • Execution of electrical installation and I&C systems of C3B conveyer and two mobile conveyers.

Malbork Sugar Factory

  • Modernisation of cleanup and transport line for beetroot throughput.

Celon Pharma S.A

  • Execution of electrical installation in newly built research and development centre.

Sempertrans

  • Sempertrans MIX-5 – Construction of power installation and automatics for mixer 5 in Sempertrans object in Bełchatów.

GE Gamma USK Łódź

  • Execution of essential works allowing for optimal working conditions for GE Gamma apparatus in cardiological research studio in Central Clinical Hospital in Łódź.

Euroglas

  • Construction of cable route and montage of electrical installation in EUROGLAS POLSKA facility.

Łódź Technical University

  • Broad overhaul of 7th and 8th floor of the 4th hall of residence of Łódź Technical University.

PGE Bełchatów Zone

  • Construction of mid-voltage cable lines in route: GPZ Bełchatów – Investment zone B1 and B2.
  • Construction of mid-voltage cable connections in Bełchatów.

PGE

  • Parzęczew.
  • Bliska Wola.
  • Łowicz.
  • Zagłówki.
  • Łódź, Krakowska Street.
  • Łódź, Stefanowskiego Street .
  • Rawa Mazowiecka.
  • Łódź, Obywatelska Street.
  • Łódź, Kilińskiego Street.
  • Zgierz, Dąbrowskiego Street .
  • Ozorków.
  • Biała Rawska.
  • Łódź, Zakładowa Street.
  • Łódź, Bema Street.
  • Starowa Góra.
  • Zgierz ul. Kiełmina.
  • Zgierz, Boruta Street.
  • Zgierz, Aleksandrowska Street.
  • Łódź, Wydawnicza Street.
  • Łódź, Kąkolowa Street.
  • Łódź, Chochoła Street.
  • Siemkowice.

2017


Temple of God’s Providence in Warsaw

  • Electric and tele technical installations – “Pantheon of Great Poles”.

Reckitt Benckiser Nowy Dwór Mazowiecki

  • Execution of I&C systems installation for soda transporters on factory grounds.
  • Aspiration system TABS 2.

BSH Łódź

  • ML1 and ML2 fitting.
  • Modernisation of PUMU PROG installation.

Barry Callebaut Łódź

  • Line number 7.

Military Medical Academy

  • CT scanner.

Kellogg’s

  • Modernisation of electrical installation in cabinet 0200_MCP_1000, in cabinet 0600_JB_100 and installation of ARBO project on factory grounds.

Malbork Sugar Factory

  • Modernisation of cleanup and transport line for beetroot throughput.

LaLorraine Bakery

  • Extension of LaLorraine Bakery Stage II – Installation of I&C systems of ventilation.

PGE

  • Bełchatów.
  • Sieradz.
  • Tomaszów Mazowiecki.
  • Żyrardów.
  • Łowicz.
  • Łódź, Krakowska Street.
  • Łódź, Wypoczynkowa Street.
  • Łódź, Leśna Street.
  • Łowicz -Bielawy.
  • Łódź, Wspólna Street.
  • Łódź, Skargi Street.
  • Piotrków Trybunalski.
  • Leźnica.
  • Rzgów 500 Jubilee Square.
  • Kalino.
  • Łódź, Wólczańska Street.

2016


Nowy Staw near Malbork

  • Modernisation of electrical installation and illumination in sugar storage building alongside the social hinterland.

Pilgrim’s house Skolimów

  • Execution of electro energetic systems and low-current networks.

Barry Callebaut Łódź

  • Execution of wiring and instalatory works for line no. 6 automatics.

Eko Cogeneration Kutno

  • Construction and start-up of container transformer station.
  • Extension of mid-voltage 15 kV cable connection – power supply of built 15/0,4 kV trafo station, powering Prima Park mall in Kutno.

Panattoni Pruszków

  • Installment of mid-voltage 15 kV power line for Panattoni Pruszków facility.
  • Removal of overhead mid-voltage 15 kV collision – reconstruction for cable line on Zakładowa street in Łódź.

PGE Distribution S.A.

  • Reconstruction of circuit closers in mid-voltage fields in RSN Nowy Józefów.
  • Reconstruction of 15 kV line – Replacement of  pole stands in Pabianice.
  • Assemblage of remotely controlled mid-voltage connectors in OŁT RE area – Bełchatów.
  • Assemblage of remotely controlled mid-voltage connectors in OŁT RE area – Piotrków Trybunalski.
  • Assemblage of remotely controlled mid-voltage connectors in OŁT RE area – Sieradz.
  • Assemblage of remotely controlled mid-voltage overhead circuit closers (reclosers) in RE Łódź area – City.
  • Mid-voltage line Łowicz-Sochaczew, reconstruction of overhead 15 kV line.
  • Reconstruction of 15 kV and 0,4 kV line – Replacement of pole transformer stations in Żyrardów area.

Rzgów Municipal Office

  • Conservation of street lighting on Rzgów parish territory
  • Construction of warning signalisation on the crossroads in Kalinko.
  • Lighting modernisation in Rzgów.

Rzgów Parochial Church

  • Modernisation of lighting and network infrastructure of the property.

JTI

  • Execution of automatics installation for tobacco packaging line in JTI production facility in Gostków Stary.

LaLorraine Bakery

  • Execution of power installation and ventilation control systems with supply of full automatics systems.

Sempertrans Bełchatów

  • Instalatory works in extent of mid and low-voltage power supply and wiring of mixer 1 automatics in Sempertrans facility in Bełchatów.

BSH Łódź

  • Execution of instalatory works.

Military Aviation Plant no. 1 S.A.

  • Execution of lightning protection system on building no 1/55.
  • Execution of low-voltage cable line powering the storage building.
  • Liquidation of a collision between mid-voltage 15 kV powering cable with modernised 1/4 building.

Malbork Sugar Factory

  • Execution of horizontal diffusors wiring installation.

Philips Pabianice

  • Execution of instalatory-montage works.

Temple of God’s Providence in Warsaw

  • Illumination with Phillips integuments.

2015


Kelleog’s Kutno

  • Execution of electrical installation.

Barry Callebaut Łódź

  • Exchange of power supply system 15 kV of Barry Callebaut facility.
  • Assemblage of illumination on facility grounds.

MY FIELD – ORLIK 2012

  • Completion of football fields as a part of the complex MY FIELD.

MOS Łódź

  • Construction of multifunctional field and renovation of sporting equipment.

Primary school no. 122 in Łódź

  • Construction of multifunctional field.

BSH

  • Execution of electrical installation.
  • Measurement of electric parameters of assembly line.
  • Execution of wiring and automatics electrical installations  on H2 building grounds in a wing intended for MTB laboratory on Warsaw Aviation Institute grounds.

Łódź Extracurricular Activity Centre

  • Execution of building electrical connection.

K. Jonscher Clinical Hospital

  • Execution of RTG studio electrical installation.

Chełm Hospital

  • Execution of low-voltage electrical installations.

Piła Hospital

  • Execution of electrical installations: Room adaptation for CT Specs.

Blessed Virgin’s Specialist Hospital

  • Room Renovations.

Krasnystaw Private Hospital

  • Room adaptation for magnetic resonance
  • Room adaptation for CT scanner Cr.

Hospital no. 4 in Lublin

  • Construction works connected to CT scanner replacement on the second floor of  BAE block’s segment E.
  • Construction works connected to CT scanner replacement on the second floor of FNG block’s segment E.

Rybnik Hospital

  • Execution of low-voltage electrical installations as a CT scanner adaptation in Rybnik’s hospital.

Rzeszów Voivodeship Hospital

  • Renovation of CT scanner studio and reconstruction of low-voltage technical rooms.

Silesia Zabrze

  • Creation of Silesian Cardio-Medical Technology Park – Adaptation works.

Oboniki Hospital

  • Execution of CT electrical installation.

Ciborz Hospital

  • Execution of CT electrical installation.

Health Centre Institute in Łódź

  • Emergency door openings, intercom repairs.

La`Lorraine Bakery

  • La Lorraine bakery extension- electrical installation.

Barry Callebaut Łódź

  • Wiring and instalatory works for Line no. 5.

Warsaw Aviation Institute

  • Execution of wiring and automatics electrical installations  on H2 building grounds in a wing intended for MTB laboratory on Warsaw Aviation Institute grounds.

Phillips Pabianice

  • Execution of electrical, montage and instalatory works for modernised RB3 line.

Sempertrans Bełchatów

  • Instalatory works in the stope of an extruder and a mixer.

PGE Distribution S.A.

  • Reconstruction of a mid-voltage pole stand of overhead mid-voltage line – Wola Kutowa.
  • Construction of mid-voltage/low-voltage cable lines interior station – Ksawerów.
  • Construction of mid-voltage/low voltage cable lines interior station – Łódź.
  • Reconstruction of links with drivetrains and disconnector switch tele steering devices in mid-voltage overhead lines.
  • Modernisation of electrical network, construction of mid-voltage electrical connector, mid-voltage cable line, disassembly and construction of mid-voltage overhead line in Konstantynów Łódzki.
  • Reconstruction of transformer station alongside the reconstruction of existing cable lines – Matejki street, Łódź.
  • Reconstruction of 15 kV network – disconnector switch replacement in overhead lines Z2 Zgierz.
  •  Reconstruction of 15 kV network – disconnector switch replacement in overhead lines Z3 Pabianice.
  • Construction of low-voltage/mid-voltage cable line interior station – Łódź.
  • Reconstruction of exterior low-voltage/mid-voltage transformer stations – Zgierz.
  • Reconstruction of exterior low-voltage/mid-voltage transformer stations – Stryków.
  • Mid-voltage cable line construction – Zakładowa 99, Łódź.
  • Low-voltage cable line construction – Rzgów.
  • Modernisation of mid-voltage remotely controlled connectors in OŁT-RE area -Tomaszów Mazowiecki.
  • Modernisation of mid-voltage remotely controlled connectors in OŁT-RE area – Piotrków Trybunalski.
  • Modernisation of mid-voltage remotely controlled connectors in OŁT-RE area – Sieradz.
  • Modernisation of mid-voltage remotely controlled connectors in OŁT-RE area – Bełchatów.

God’s Providence Temple in Warsaw

  • Construction of wiring canalisation – electrical switchgears, interior wiring routes, temple lighting electrical installation, power supply and lighting of the construction site.
  • Main exposition in John Paul the Second and Primate Wyszyński museum – electro instalatory works.

Rzgów Municipal Office

  • Construction of installation powering instantaneous water heaters in the clubhouse.
  • Solar clock lighting in Rzgów Old Town
  • Street lighting conservation in Rzgów perish.
  • Construction of cautionary lighting in Guzew.

Military Aviation Plant no. 1 in Łódź

  • Renovation of current installations for needs of building no. 1/46.
  • Modernisation of building no. 1/46.

District Starosty in Zgierz

  • Inspection of evacuation and emergency lighting in starosty’s building.

Środa Wielkopolska Sugar Factory

  • Execution of installations and automatics of sugar spinner.
  • Delivery of trafo station for wind plant generator.

Eko Cogeneration Kutno

  • Construction of mid-voltage 15 k V electrical connector – power supply of trafo 15/0,4 kV powering Multimedia Polska building.

Waste Development Centre – Ruszczyn

  • Construction of waste development centre in Ruszczyn – comprehensive execution of works for the entire building in the scope of power engineering, networks, and low-current systems.
  • Extension of the fire alarm installation and fire signalisation system extension.

2014


PKP ENERGETICS S.A.

  • Replacement of  Żyrardów traction substation powering 15 kV cable line.
  • Construction of mid-voltage cable lines, control cables with multiple aperture wiring canalisation for Pruszków traction substation.

Żyrardów Sewage Works

  • Modernisation of mid-voltage/low-voltage powering system.

PGE Distribution ŁM Unit

  • Construction of powering system alongside the construction of mid-voltage cable lines and montage low-voltage and mid-voltage master switch room for newly-built “Sukcesja” mall in Łódź.

Puławy City Hospital

  • Gynaecology wing renovation.

Łódź Special Economic Zone Lućmierz

  • Removal of collisional overhead 15 kV line and construction of ew cable line.
  • Construction of road system lighting and low-voltage power supply line.
  • Construction of 0,4 kV cable line powering sewage pumping station.
  • Removal of collisional 15 kV cable line from property grounds of ŁSEZ in Konstantynów Łódzki.

City Heat Energetics in Piła

  • Construction of mid-voltage 15 kV electric connection for cogeneration system power supply.

Rawa Waterworks and Sewage Systems

  • Modernisation of mid-voltage/low-voltage electrical devices powering the sewage works.

Rzgów City

  • Creation of Rzgów’s showcase by catwalk illumination and creation of visualisation system for information board.

Rzgów Perish

  • Street lighting conservation.

Cracow Physical Education Academy

  • Planned works alongside the reconstruction of mid-voltage/low-voltage switch room and execution of 15 kV cable line.

Dobra Stryków Perish

  • Construction of mid-voltage 15 kV cable line for Panattoni facility.

God’s Providence Temple in Warsaw

  • Construction of wiring canalisation on northern square on the grounds of God’s Providence Centre complex.

My Pitch – ORLIK 2012

  • Electrical installations on pitch grounds of Gymnasium no. 24 in Łódź.
  • Electrical installations on pitch grounds of Gieczno school.
  • Electrical Installations Primary School no. 12 in Łódź.

Barry Callebaut Łódź

  • Execution of wiring and instalatory works in the shop of electrics and automatics in Barry Callebaut facility.

Pasłęk Milk Plant

  • Execution of wiring and instalatory works.

Brzesko Brewery

  • Execution of wiring and instalatory works on BBT containers.

Świdnica Sugar Factory

  • Execution of wiring and instalatory works.

Środa Wielkopolska Sugar Factory

  • Execution of wiring and instalatory works.

2013


Military Aviation Plant in Łódź

  • Execution of electrical and low-current works in 1/9 building.

Józef Piłsudski Mound in Cracow

  • Execution of power supply.

FALA Pool Complex

  • Execution of property lighting alongside CCTV systems.

Łódź Special Economic Zone

  • Construction of cable line alongside cable power strip.

Warsaw’s Medical Institute’s Military Hospital

  • Room adaptation for CT Scanner.

Warsaw Municipal Sewage and Waterworks Enterprise

  • Construction of 15/0,4 kV container-based transformer station.

Residential Medical Care Facility in Warsaw

  • Execution of summoning system installation.

National Atomic Research Centre

  • Renovation of mid-voltage 15 kV cable lines from building 10 (Spruce main station) to sub-station OPT-5.

PGE DISTRIBUTION S.A.

  • Construction of low-voltage cable line for Składowa street in Łódź.
  • Inspection and modernisation of overhead 15 kV line direction: Brzezińska-Brzeziny.

2012


Stryków Printing House

  • Electrical works.

Castle Culture Centre

  • Reconstruction and extension of k-29 6/0,4 kV transformer station powering Poznan’s Castle Culture Centre.

Kutno Heat Energetics Facility

  • Construction of mid-voltage 15 kV electric connection for cogeneration system power supply.

Rzeszów Voivodeship Hospital

  • Execution of power supply infrastructure in shape of new mid-voltage/low-voltage container-based station and replacement interior switch room.

Military Aviation Plant in Łódź

  • Execution of electrical and low-current works in building 1/19.
  • Replacement of WLZ 0,4 kV cable lines.

Namysłów Brewery

  • Execution of electro instalatory and assembly works for modernised BBT container line.

Warsaw Smelter

  • Execution of electro instalatory and assembly works.

God’s Providence Temple in Warsaw

  • Construction of Lightning Protection System for the dome construction.

Kruszwica Sugar Factory

  • Electro instalatory and assembly works.

Strzelin Sugar Factory

  • Electro instalatory and assembly works.

PGE DISTRIBUTION S.A.

  • Reconstruction of overhead 15 kV mid-voltage line near Kozłowska street in Łódź.
  • Construction of mid-voltage/low-voltage pole station and construction of low-voltage cable line in Wardzyn.
  • Construction od mid-voltage and low-voltage electrical networks on Tuwima street in Łódź.

Warsaw Military Technical Academy

  • Replacement of electrical installation in hangar no. 7.

2011


Łódź Sewage and Waterworks Plant

  • Lighting renovation for Telefoniczna pumping station with power line exchange.
  • Renovation of illumination lantern complex on poles and power lines on Zbiorniki-Stoki area.

Residential Buildings Unit “Twin” in Ozorków

  • Construction project of indoor electrical installations.
  • Construction of electrical connection, powering Konstantynów’s pumping station.

Łódź Technical University

  • Measurement positions powering in Łódź.

Łódź Homeowner Association

  • Anti-icing system on multifamily building on Kołowa Street.

Łomża Regional Brewery

  • Execution of spinner’s wiring installation and replacement of frequency converters.

Heat and Power Plant no. 3 in Łódź

  • Construction of power supply to mill ventilator engines and K-3 boiler blast ventilators.

Malbork Sugar Factory

  • Modernisation of automatics systems for beat pulp drying room.

Staszów City Hospital

  • Replacement of low-voltage switchgear.

Strzelin Sugar Factory

  • Execution of wiring installations for 4 cyclical spinners.

Heat Energy Plant in Pabianice

  • Execution of boiler wiring installation.

Primary Schools in Łódź

  • Execution of sports grounds as part of the project ORLIK – 2012.

PGE Distribution Łódź City Branch

  • Execution of electrical works witch project documentation.
  • Construction of low-voltage electrical connection street Plonowa 8.
  • Construction of low-voltage electrical connection street Solarza 8.
  • Construction of low-voltage electrical connection street Beskidzka 25.
  • Construction of low-voltage cable line street Brzóski 24.
  • Extension of low-voltage electrical connection street Kościuszki 52.
  • Construction of cable line with integrated cable junctions with measurement superstructure in Kotowice.
  • Construction of overhead low-voltage 0,4 kV line in Moskwa.
  • Execution of electrical network by Liściasta and Rogozińskiego street.
  • Construction of cable connector installation with type RSL SN switchgear with a connection to existing mid-voltage cable network for target basic power supply for ROSSMANN company.
  • Low-voltage electrical connection with cable connector for service venue power supply.
  • Reconstruction of mid-voltage and low-voltage line, equipment of existing station building on Polna street in mid-voltage and low-voltage devices and construction of ground-floor 15 kV station on Gałczyńskiego street in Zgierz.
  • Emergency mid-voltage cable replacement on Stefana street in Łódź.

Zgierz Bakery Plant

  • Execution of electrical and low-current installations/

Fiscal Control Bureau in Łódź

  • Design and construction of low-voltage electrical connection and master low-voltage switch room.
  • Electrical installation in residential buildings with underground garage on Pustułeczki, Mokolągwy and Rolna street in Warsaw’s Ursynów district.

GLKS Zawisza Rzgów

  • Execution of electrical installation.

ECO Kutno

  • Construction of mid-voltage 15 kV electrical connection – energetic power supply of the cogeneration,

John Paul the Second and Primate Wyszyński Museum

  • Technical works. Museum power supply Stage 1.

God’s Providence Centre

  • Execution of dome lightning protection system.

God’s Providence Temple in Warsaw

  • Installation of Fire Signalisation System.

Military Aviation Plant no. 1 in Łódź

  • Modernisation of electrical and low-current installations hangar 1/17.
  • Renovation of electrical and low-current installations in building 1/37.
  • Lightning protection system of building 1/59of Mechanical Division.
  • Modernisation of property lighting – replacement of poles and power supply lines.
  • Execution of optic fibre communication infrastructure between the buildings.
  • Construction of tele technical canalisation and modernisation of telecom lines.
  • Stock taking, disassembly and replacement of WLZ line between the buildings.
  • Ex lighting installation for Disassembly Division Hangar.

2006 – 2010


ARTCEM Cement Plant

  • Modernisations and construction of new electric lines, reconstruction of switchgears, energy division.
  • Modernisations and construction of new control systems and automatics.
  • Clerical building – Design and construction of electrical, tele technical and low-current installations.

Psychiatric Clinic in Łódź

  • Modernisation of electrical, tele technical and low-current installation.

Grocery wholesaler and storage in Piotrków Trybunalski

  • Execution of tele technical and low-current installations in clerical building.
  • Execution of tele technical installations in storage halls.
  • Execution of external optic fibre canalisation.

Ministry of Internal Affairs Hospital in Łódź

  • Execution of RTG studio power supply installation with infrastructure.

Bielański Hospital in Warsaw for WIBUD Nidzica

  • Neurology wing – modernisation of electrical, tele technical and low-current installations.

Bielański Hospital in Warsaw for Polimex Mostostal Warszawa

  • Traumatology wing – modernisation of electrical, tele technical and low-current installations.

PRB Budomal

  • Office surfaces – Electrical and tele technical installations.

Voivodeship and City Public Library in Łódź

  • CCTV installation.

Jędrzejów Brewery for Mawos

  • Execution of automatics and control installation.

Krysiewicz Hospital in Poznań

  • Analytical Laboratory – execution of electrical and low-current installation.

Zgierz District Starosty

  • Complex replacement of electrical and tele technical installation.

Nursing Home in Łódź

  • Modernisation of low-current installations.

Military Aviation Plant no. 1 S.A.

  • Modernisation of starting hangar lighting.
  • Modernisation of lightning and power surge protection systems and equatorial connections in headquarters building.
  • Replacement of electrical and tele technical installation for IT Division building.
  • Replacement of mid-voltage 15 kV cable line and low-voltage 1 kV line.
  • Replacement of lightning protection systems on multiple buildings.
  • Modernisation of lighting in Connections Department.
  • Modernisation of lighting in Galvanising Plant.
  • Replacement of electrical and low-current installation with switchgear replacement in Mechanical Division building.
  • Auto – Service Proxima Bosch Service (2009).
  • Repair hall – execution of electrical and tele technical installation.

Primary School no. 109 in Łódź.

  • Modernisation of electrical installation and interior lighting of classrooms.

PTA Orlen Włocławek for Polimex Mostostal Warszawa

  • Execution of electrical, lightning protection, low-current, control, automatics, air conditioning and ventilation installations in storage halls, technological buildings and transformer stations.

Sue Rider Healthcare Centre for Polimex Mostostal Warszawa

  • Execution of tele technical and low-current installations in newly built medical pavilion.

Bielański Warsaw Hospital for Polimex Mostostal Warszawa

  • General Surgery Wing – Modernisation of electrical, tele technical and low-current installations.

Turów Power Plant for Mawos

  • Execution of control and automatics installations for shatter valves located in chimney refrigerator.

Strzelin Sugar Factory for Mawos

  • Execution of control and automatics installation.

Malbork Sugar Factory for Mawos

  • Execution of technological drivetrains power supply systems and control/automatics installation.

Medical Academy of Central Clinical Hospital for Nixen

  • Execution of tele technical and low-current installations.

Świątynia Opatrzności Bożej

God’s Providence Temple in Warsaw

  • Execution of master power supply with delivery and assembly of master low-voltage switch room.

PGE Dystrybucja

  • Constant cooperation with local PGE Distribution branches – planned works and cable line execution.

Neste

  • Constant 24 hour exploratory service for NESTE’s fuel stations for Central Poland.

2004-2006


Self-Governing Public Healthcare Trust in Pabianice (200-2006)

  • Casualty department – Tele technical installations, medical equipment.
  • EMS department – Admission room – Electrical and tele technical installations.
  • Intensive Treatment – Execution of electrical, tele technical and low-current installations.
  • II Internal Wing – Renovation of the entire wing (groundwork, sewage, electrical, tele technical and low-current installation).
  • Analytical Laboratory – Execution of electrical, tele technical and low-current installations.
  • RTG studio with accompanying infrastructure – Execution of electrical, tele technical and low-current installations.
  • Psychiatric Wing – Execution of electrical, tele technical and low-current installations.

Military Medical Academy’s Clinical Hospital in Łódź (2006)

  • RTG Studio – Modernisation of electrical, tele technical and low-current installations.
  • Entire hospital compound – Security and exploratory measurements.

District Employment Bureau no.1 in Łódź

  • Entire building – LAN wiring execution.
  • Execution of internal guaranteed power supply fo UPS powering.