Realizations 2012

  • Electrical power works in the printing house in Stryków.
  • Reconstruction and extension of the k-29 6/0.4 kV transformer station supplying Centrum Kultury Zamek in Poznań.
  • Construction of the 15 kV MV power connection for powering the cogeneration system for Zakład Energetyki Cieplnej (Heat Engineering Plant) in Kutno.
  • Execution of the power supply infrastructure in the form of a new MV/LV container station and the replacement of the 15 kV MV interior switchgear in the Rzeszów Provincial Hospital.
  • Power and low voltage electrical works in the building No. 1/19 at Wojskowe Zakłady Lotnicze (Military Aviation Plant) in Łódź.
  • Replacing of 0.4 kV internal power supply cable lines to buildings at Wojskowe Zakłady Lotnicze (Military Aviation Plant) in Łódź.
  • Performing electrical installation and assembly works for the modernized line of BBT tanks in the Namysłów Brewery.
  • Performing electrical installation and assembly works in ironworks area in Warsaw.
  • Execution of lightning installations of the dome construction of the Temple of Divine Providence in Warsaw.gallery}realizacje/2012/SwiatyniaWarszawie{/gallery}
  • Execution of electrical installations and assembly works at Kruszwica Sugar Plant.
  • Execution of electrical installations and assembly works at Strzelin Sugar Plant.
  • PGE DYSTRYBUCJA S.A.
    • Reconstruction of 15 kV MV overhead line on 15 kV MV cable line in Lódź at ul. [street] Kobzowa.
    • Construction of the MV/LV pole station and the execution of the LV cable line in Wardzyn.
    • Construction of MV and LV power networks in Łódź at ul. [street] Tuwima
  • Replacement of electrical and teletechnical installations in the hangar No. 7 in the Military Technical Academy in Warsaw.