REALIZATIONS

Realizations 2014

  • Replacement of the 15kV cable line powering a Żyrardów traction substation for PKP ENERGETYKA S.A.
  • Modernization of MV/LV power supply system for Żyrardów sewage treatment plant.
  • PGE Dystrybucja, branch ŁM - Implementation of the power supply system including the construction of MV cable lines and the assembly of MV and LV main switchgear for the newly built "SUKCESJA" Gallery in Łódź.
  • Renovation of the Gynecology Department at the Municipal Hospital in Puławy.
  • LUCMIERZ Łódź Special Economic Zone.
    • Removal of the collision 15 kV overhead power line and building a new cable line.
    • Construction of the road lighting system and LV power cable line.
    • Construction of the 0.4 kV power cable line supplying electricity to a sanitary sewage pumping station.
    • Removal of the collision 15 kV overhead line from the area of ŁSSE parcels in Konstantynów Łódzki.
  • Construction of 15 kV MV power connection for power supply of cogeneration system for Miejska Energetyka Cieplna (Municipal Thermal Power Plant) in Piła.
  • Modernization of 15/0.4 kV MV/LV power equipment supplying wastewater treatment plant for Rawskie Wodociągi i Kanalizacja (Rawa Mazowiecka Water Supply and Sewerage).
  • Creation of a showcase of Rzgów through the illumination of a footbridge and the creation of a visualization of the information board.
  • Maintenance of street lighting in the municipality of Rzgów.
  • Design work including the redevelopment of MV/LV switchgear and construction of MV 15 kV cable line at the Academy of Physical Education in Kraków.
  • Construction of 15 kV MV power lines, control cables together with cable ducting, multi-hole for the Pruszków traction substation - for PKP Energetyka S.A.
  • Installation of 15 kV MV power line for the Panattoni facility in Dobra, municipality of Stryków.
  • Construction of a cable duct in the North Square, within the Temple Cultural Complex in Warsaw.
  • Execution of sports fields as part of the construction of the complex MOJE BOISKO - ORLIK 2012.
    • Electricity installations on the sports field of the Gymnasium 24 at ul. [street] Pogonowskiego in Łódź.
    • Electricity installations on the school sports field in Gieczno.
    • Electrical Installations, the Primary School No. 12, ul. [street] Jurczyńskiego 1/3, Łódź.
  • Execution of wiring and installation works in the field of electrical and automation in Barry Callebaut Production Plant in Lódź - line 4.
  • Implementation of wiring and installation works at the dairy plant in Pasłęk.
  • Implementation of wiring and installation works on BBT tanks in the Brzesko Brewery.
  • Execution of wiring and installation works at the Świdnica Sugar Plant.
  • Execution of wiring and installation works at the Sugar Factory in Środa Wielkopolska.