REALIZATIONS

Realizations 2015

  • Execution of electrical installation works at Kelleogg's Production Plant in Kutno.
  • Change of 15 kV power supply system of Barry Callebaut Production Plant in Łódź
  • Implementation of sports fields as part of the construction of the complex MOJE BOISKO - ORLIK 2012
  • Construction of a multipurpose sport field and renovation of sports facilities MOS, ul. Spadkowa in Łódź.
  • Construction of a multipurpose sport field for the Primary School No. 122 in Łódź.
  • Execution of electrical installation works on the premises of the Production Plant - BSH.
  • Execution of the power connection to the building in the area of the Extracurricular Activities Center, ul. [street] Parkowa 1 in Łódź.
  • Execution of the power supply infrastructure and peripheral systems for the supply of medical equipment in radiological departments of hospitals:
    • Execution of electrical installation in the RTG laboratory in the K. Jonscher Clinical Hospital.
    • Execution of low voltage electrical installations as part of the adaptation of CT rooms in Chełm hospital.
    • Execution of low voltage electrical installations as part of the adaptation of MRI rooms in Chełm hospital.
    • Execution of electrical installations: adaptation of SPECT rooms in Piła hospital.
    • Renovation of the rooms of the CT Laboratory of the Provincial Specialist Hospital of the Blessed Virgin Mary.
    • Adaptation of rooms for magnetic resonance in SPZOZ in Krasnystaw.
    • Adaptation of rooms for computer tomograph in the main hospital building in the SPZOZ in Krasnystaw.
    • Construction work related to computer tomography replacement on the second floor of segment E, block BAE in SPSK No. 4 in Lublin.
    • Construction work related to computer tomography replacement on the second floor of segment E, block FNG in SPSK No. 4 in Lublin.
    • Implementation of low voltage electrical installations under the adaptation of TK rooms in the hospital in Rybnik.
    • Repair of the computer tomography laboratory and reconstruction of low voltage technical ground floor rooms in the provincial hospital in Rzeszów.
    • Establishment of the Silesian Park of Cardio-Medical Technology Silesia in Zabrze - adaptation works.
    • Execution of electrical installation for CT in Oborniki.
    • Execution of electrical installation for CT in Cibórz.
  • Emergency door opening, repair of the door intercom system in the KN at the Institute of Mother's Health Center in Łódź.
  • Expansion of La'Lorraine bakery in Nowy Dwór Mazowiecki - electrical installation works.
  • Conducting wiring and installation work for automation line No. 5 at the Barry Callebaut Production Plant in Łódź.
  • Measurement of the electrical parameters of the LM1 assembly line at BSH.
  • Installation of the electrical system in the area of the building H2 in the part intended for the MTB laboratory at the Institute of Aviation in Warsaw.
  • Electrical, mounting, and installation work for the modernized RB3 line at the Philips Plant in Pabianice.
  • Installation works on extruders and a mixer at the Sempertrans facility in Bełchatów.
  • PGE Dystrybucja S.A.
    • Reconstruction of MV pole position of MV overhead line - Wola Kutowa.
    • Construction of the MV/LV interior station of the cable lines - Ksawerów.
    • Construction of the MV/LV interior station of the cable lines - Łódź.
    • Reconstruction of switchgear stations with actuators and remote control devices for remote-controlled disconnectors in MV aerial lines.
    • Modernization of the power network, construction of the MV cable coupler, MV cable line, dismantling and construction of the MV overhead line in Konstantynów Łódzki.
    • Reconstruction of the transformer station with the reconstruction of existing cable lines, ul. [street] Matejki in Łódź.
    • Reconstruction of the 15 kV network - exchange of disconnection posts in overhead lines in Z2 Zgierz area.
    • Reconstruction of the 15 kV network - exchange of disconnection posts in overhead lines in Z2 Pabianice area.
    • Construction of the MV/LV indoor cable station - Łódź.
    • Reconstruction of MV/LV overhead transformer station - Zgierz.
    • Reconstruction of MV/LV overhead transformer station - Stryków.
    • Construction of MV cable lines, Łódź, ul. [street] Zakładowa 99.
    • Construction of the LV cable line, Rzgów.
    • Modernization of remote-controlled MV connectors OŁT-RE - Tomaszów Mazowiecki.
    • Modernization of MV couplings controlled remotely in the area of OŁT-RE - Piotrków Trybunalski.
    • Modernization of MV couplings controlled remotely in the area of OŁT-RE - Sieradz.
    • Modernization of MV couplings controlled remotely in the area of OŁT-RE - Bełchatów.
  • Temple of Divine Providence in Warsaw.
    • Construction of cable ducting - electrical switchgear, internal cable routes, electrical lighting of the temple - power supply and lighting of the building site.
    • Main exhibition of the Museum of John Paul II and Primate Wyszyński - electrical installation works.
  • City Hall in Rzgów.
    • Execution of the installation supplying flow water heaters in a lounge.
    • Lighting of the sun clock on the Old Market in Rzgów.
    • Maintenance of street lighting in the municipality of Rzgów.
    • Modernization of the power supply system in the Municipal Cultural Center building in Rzgów.
    • Execution of warning lighting in Guzewo.
  • Wojskowe Zakłady Lotnicze (Military Aviation Plant) No. 1 S.A. in Łódź:
    • Renovation of earth systems for the building No. 1/46.
    • Modernization of the building No. 1/46 in Łódź.
  • Overview of emergency and evacuation lighting in buildings of the District Office In Zgierz.
  • Installation of the electrical system wiring in the area of the building H2 in the part intended for the MTB laboratory at the Institute of Aviation in Warsaw.
  • Electrical, mounting, and installation work for the modernized LM1 line at the BSH.
  • Installation of lighting fittings at the Barry Callebaut Production Plant in Łódź.
  • Execution of installation and automation of sugar centrifuge in sugar plant in Środa Wielkopolska.
  • Delivery of the transformer station for the generator of the wind power plant.
  • Construction of 15 kV medium voltage cable connection - power supply of the transformer station 15/0.4 kV powered the Multimedia Polska building - for ECO KOGENERACJA in Kutno.
  • Construction of the Waste Management Plant in Ruszczyn - comprehensive work for the whole object in the field of power engineering, networks, and low current systems.
  • Expansion of fire protection system and expansion of fire alarm system in the area of Waste Management Plant in Ruszczyn.