REALIZATIONS

Realizations 2016

  • Modernization of electrical installations and lighting in the building of the sugar warehouse together with social and living facilities in Nowy Staw near Malbork.
  • Performing power engineering works and low-current systems and networks at the Pilgrim's House in Skolimów.
  • Conducting wiring and installation work for automation line No. 6 at the Barry Callebaut Production Plant in Łódź.
  • Construction and commissioning of container transformer station and extension of 15 kV medium voltage cable connection - power supply of the constructed 15/0.4 kV transformer station supplying Prima Park Gallery in Kutno - for EKO KOGENERACJA in Kutno.
  • Execution of MV 15 kV power line for Panattoni facility in Pruszków.
  • Removal of collision 15 kV MV overhead line - reconstruction to cable line in Łódź at ul. [street] Zakładowa.
  • - PGE Dystrybucja S.A.
    • Reconstruction of circuit breakers in medium voltage fields in the RSN Nowy Józefów.
    • Reconstruction of the 15 kV network - exchange of pole positions in Pabianice.
    • Installation of MV couplings remotely controlled in the area of OŁT RE - Bełchatow.
    • Installation of MV couplings remotely controlled in the area of OŁT RE - Piotrków Trybunalski.
    • Installation of MV couplings remotely controlled in the area of OŁT RE - Sieradz.
    • Installation of MV overhead switchgears (reclosers) remotely controlled in the area of RE Łódź - Miasto.
    • MV Łowicz line 1 - Sochaczew, reconstruction of the 15 kV overhead network.
    • Reconstruction of 15 KV and 0.4 kV network - exchange of transformer pole substations in Żyrardów.
    • Installation of MV overhead disconnectors remotely controlled in the area of RE Łódź - Masto.
  • Town Hall in Rzgów.
    • Maintenance of street lighting in the municipality of Rzgów
    • Construction of a warning signal at the intersection of roads in Kalinko.
    • Modernization of lighting in Rzgów.
  • Execution of the modernization of the network infrastructure and lighting of the Parish Church in Rzgów.
  • Execution of automation systems for tobacco packing lines at the JTI production plant in Gostków Stary.
  • Installation of power supply and control installations of ventilation units together with the delivery of a complete automation system for La'Lorrain Bakery in Nowy Dwór Mazowiecki.
  • Installation works in the MV, LV power supply and automation wiring of the mixer No. 1 at the Sempertrans facility in Bełchatów.
  • Installation works at the production plant - BSH in Łódź.
  • Wojskowe Zakłady Lotnicze (Military Aviation Plant) No. 1 S.A.
    • Execution of lightning installation on the building 1/55.
    • Construction of the LV cable line supplying the warehouse building.
    • Removal of collision of 15 KV MV power cable with the modernized building No. 1/46.
  • Installation of horizontal diffuser cabling in Malbork Sugar Plant.
  • Execution of installation and assembly works at Philips Plant in Pabianice.
  • Temple of Divine Providence - illumination on PHILIPS luminaires.